The Brief
As Industrial and Commercial fit-out specialist Tapper Interiors were appointed as main fit-out contractor to a building shell over 4 phases. We were not permitted to take photographs of the work due to the sensitive nature of the clients environment.
What We Did
Tapper Interiors took the site on from a basic external envelope and completely fitted it out.
Works included:
- Plasterboard and tile suspended ceilings
- Internal partitions
- Fire rated glazed partitions
- Internal doorsets
- Floor coverings
- Decorations
- Mechanical and electrical Installations
- Toilets complete with IPS system
- Benching and workbenches
- Secure door entry systems
- Blast resistant window blinds
- Roller shutter security screens
- Kitchens
- Ceramic tiling
- Specialist floor painting.
How We Made a Difference
We worked closely with the client over the 4 phases to ensure that disruption to day to day operations was minimised to allow “business as usual”, in a very secure environment.
All phases were successfully negotiated and delivered to budget and inside agreed timescales.
Client:
Enterprise Control Systems Ltd
Value:
£1,770,000 over 4 phases
Scope:
- Phases 1 & 2 £995,000
- Phase 3 £125,000
- Phase 4 £650,000
Duration:
Phased over a 4 year period
Sector:
Commercial
“As part of the scope of work, Tapper Interiors were obliged to work closely with our nominated site security organization, who on occasion are less than co-operative with 3rd parties. These issues were managed in a professional and cooperative manner by Tapper Interiors and inconvenience to us as the customer was minimized.
We would happily use your services again”
Ken Poole, Enterprise Control Systems Ltd