The Brief
Tapper Interiors were appointed as the interior fit out sub-contractor at Windrush Health Centre.
What We Did
We provided a high standard of finish throughout the building with several curved walls and bulkheads, as well as differing ceiling types.
As the Fit out sub-contractor – Tapper Interiors installed
- Internal stud partitions including curved walls
- Plasterboard and grid/tile suspended ceilings, including curved sections and bulkheads
- External Metsec cladding rails and plywood panels ready to receive finishes by others
- Fire barriers
- Internal doorsets
- Joinery
How We Made a Difference
We co-ordinated well with other trades to ensure that areas were completed in a sequence to allow the programme to be accelerated. We also successfully negotiated the external works after being appointed for the internal fit out.
Client:
Beam Construction Ltd
Value:
£500,000
Scope:
- New building fit out
- External cladding rails
Duration:
26 weeks
Sector:
Health
Gallery
“All aspects of the work including suspended ceiling, metal stud partitioning and carpentry works were carried out diligently, professionally and to a very high standard. This was aided by an extremely efficient and conscientious Site Foreman who supervised the operations. I would have no hesitation in working with Tapper Interiors in the future and in fact look forward to the prospect of working together on future contracts”
Mick Linsey, Site Manager, Beam Construction Ltd