The Brief
Tapper Interiors were appointed as main contractor to provide a total Interior refurbishment to a large first floor area to provide a new Technology Innovation Centre.
What We Did
We provided temporary accommodation elsewhere within the site including temporary laboratories which allowed the area due for refurbishment to be vacated.
The first floor area was then totally stripped out and refurbished to a very high standard, and included the following works:-
Partitions , ceilings, floor coverings, decorations, mechanical and electrical installations, air conditioning, laboratory benching and desks, internal doorsets, glazed screens, toilet refurbishments including IPS panels, new sprinkler system, new kitchens to laboratory standards including specialist fryers and equipment.
How We Made a Difference
The use of temporary accommodation including laboratories ensured that McCormick UK maintained “business as usual”.
Several revisions and alterations to the project were incorporated whilst works were progressing, with the completion date remaining the same and works were successfully handed over on time.
An additional area of work to refurbish existing staircases was also added into the project whilst we were on site which was also delivered in line with the main completion date.
Client:
McCormick UK Ltd
Value:
£850,000
Scope:
- First Floor Major Refurbishment
- Temporary Accommodation provided
- McCormick UK remained in full operation Duration 20 weeks
Sector:
Commercial
Gallery
“There were several challenges along the way on this major project to meet internal customer satisfaction. Layouts changed at short notice and a professional and efficient service was provided at all times.
I would highly recommend Tapper Interiors to any organisation. They have given us a reliable, professional, friendly service and are competitively priced.”
Tracy Feehily, Project Manager, McCormick UK Ltd