Call: 01295 221240     Email: sales@tapperinteriors.co.uk        

The Brief

Tapper Interiors were appointed as the interior fit out sub-contractor at South Bar Surgery.

What We Did

We provided a high standard of finish throughout the building with several curved walls and bulkheads, as well as differing ceiling types.

Tapper Interiors Installed

  • Internal stud partitions including curved walls
  • Plasterboard and grid/tile suspended ceilings, including curved sections and bulkheads
  • Fire barriers
  • Internal doorsets
  • Joinery

 How We Made a Difference

While carrying out the interior fit out Tapper Interiors co-ordinated well with other trades to ensure that areas were completed in a sequence to allow the programme to be accelerated.

Client:

Beam Construction Ltd

Value:

£350,000

Scope:

  • Existing Building
  • Alterations and Fit out
  • Joinery

 Duration:

15 weeks

Sector:

Health

 

Gallery

“All aspects of the work including suspended ceiling, metal stud partitioning and carpentry works were carried out diligently, professionally and to a very high standard. This was aided by an exteremely efficient and conscientious Site Foreman who supervised the operations. I would have no hesitation in working with Tapper Interiors in the future and in fact look forward to the prospect of working together on future contracts”

Mick Linsey, Site Manager, Beam Construction Ltd

 

Share this